Change Order in the Group
Highlight the item in the
Assigned Diagnosis Codes
grid.
Select the up or down
Sort
arrow buttons to move the item to the desired location within the group.
Recommendations
Explore
Change Order in the Group
NextGen® Adaptive Content Engine Help Enterprise 8
Add a Diagnosis Code to a Group
Select a row in the grid to populate the Assigned Diagnosis Codes to Group – [Diagnosis Group name] grid with the associated codes. Set the Type to ICD-9 or ICD-10. Type the applicable data in the Description or Code field. Select Search. To include a single item, select the desired item from the Search Results grid and select the right arrow to move it to the Assigned Diagnosis Codes grid.The top arrow moves all of the items and the bottom arrow moves only the highlighted selection.An alert will display if the group is restricted. The user will not be able to add any new codes. Parent topic: Assigning Diagnosis Codes to a Group Section
NextGen® Adaptive Content Engine Help Enterprise 8
Delete or Remove Codes
Highlight the item or items in the Assigned Diagnosis Codes grid. Do one of the following: Select Remove to delete the specific code(s). Select the Remove All button to delete all codes. Parent topic: Assigning Diagnosis Codes to a Group Section
NextGen® Adaptive Content Engine Help Enterprise 8
Assigning Diagnosis Codes to a Group Section
The ICD-9 or ICD-10 codes option that is selected by default is determined by the code effective date set in File Maintenance. On grid row selection, the Assigned Diagnosis Codes - <name of category> populates with the codes associated to that category. Add a Diagnosis Code to a Group Change Order in the Group Delete or Remove Codes Parent topic: Managing Reference Systems, Diagnosis Groups and Codes
NextGen® Orthopedic Suite Help 80.2.14.0
Assign Diagnosis Codes to a Diagnosis Group
On the Specialty Diagnosis Group Config practice template, expand the Manage Diagnosis Groups and Codes panel. From the Add Diagnosis Group grid, select the desired record. Note: To find a newly created group, select the View Dx groups created/modified today option above the grid. The name of selected diagnosis group appears above the Assigned Diagnosis Codes grid. In the Assign Diagnosis Codes to Group section: In the Description field, enter the few characters of desired diagnosis description. For Type, select a code type: ICD-9 or ICD-10. Click Search. The diagnosis codes matching with selected search criteria appear in the Search Results grid. Select the desired diagnosis code from the search results and click Right arrow icon. The assigned diagnosis code appears in the Assigned Diagnosis Codes grid. To move all the codes from Search Results grid to Assigned Diagnosis Codes grid, click Move all icon. To rearrange the codes in the grid, use up and down arrows on the right side of th
NextGen® Adaptive Content Engine Help Enterprise 8
Assign Diagnosis Codes to Group
In the Assign Diagnosis Codes to Group section, highlight a diagnosis group in the grid under the Add Diagnosis Group section. To search for ICD-9 or ICD-10 codes: Select the ICD-9 or ICD-10 option. Enter a value in the Description field or Code field and click Search. The diagnosis codes associated with the description matching the search criteria appear in the grid. Select a diagnosis code and click the button to move the selected code to the right grid. To move all the codes to the right grid, click the button. Click Save below the right grid to save the codes to the selected diagnosis group and clear all the fields in the Manage Reference Systems, Diagnosis Groups and Codes section. To remove a diagnosis code from the grid, do one of the following: Select a row and click Remove. To remove all the codes from the right grid, click Remove All. Parent topic: Add a Diagnosis Group and Codes to a Reference System
NextGen® Therapy Suite Help 30.3.13.0
Make an Ordering Diagnosis the Treating Diagnosis
You can move any ordering diagnosis to the Treating Dx grid to make it the treating diagnosis. Select an ordering diagnosis in the Ordering Dx grid. Select the right arrow between the grids to move it to the Treating Dx grid. Parent topic: Ordering Dx and Treating Dx